Tuesday, August 03, 2010

Home improvements

I had a week off work last week and as well as a bit of socialising I got stuck into a few jobs which needed doing.

Garden stuff - We've made a start on clearing the crap out of our garden and bomb BBQ shelter.  My dad very kindly offered his assistance and his trailer.  Long story short, we moved 3 trailer loads to the dump civic amenity site recycling centre - a load of wood, a load of rocks/bricks/rubble and a load of general junk.  Treasure found so far - an amount of lead cuttings (from flashings presumably), a rear reflector for my bike, some garden tools (hoe, edging shears).  Disappointment of the proceedings - a table saw which had been left to rot in the shelter.

House stuff - Jayne varnished the fireplace surround to make it darker, I replaced the toilet seat (one of the hinges had broken), we tried some colours for the hall/stairs.

Guitar stuff - The body of the Victory Artist is nearly completely sanded (save for some annoying areas in the horns) and it is officially an Artist once more:


Short story: it's a white backed laser water slide transfer, printed black except the writing, covering the whole piece then protected with several coats of Plasti-kote Fast Dry Enamel, cut back in between with 1000 grit sandpaper.

I have found somewhere to make a 5 ply b/w/b/w/b copy of my pickguard and it went yesterday.

Last week I might have drunk some Guinness.

No comments:

Post a Comment